RMS Project Management

GMP Review for Commercial Owners: What to Examine Before Authorization

A GMP review for commercial owners should determine whether the guaranteed maximum price clearly reflects the scope, assumptions, allowances, contingencies, exclusions, alternates, and schedule basis. Unresolved exposure that the owner is being asked to authorize. The review should make the commercial boundary visible before approval. Owners should understand which portions are based on competitive buyout, […]

BMS Integration During Construction: The Coordination Gaps Owners Should Catch Early

BMS integration during construction depends on coordinated system interfaces, not simply buying a controls package. Owners should know which systems exchange data, who defines the points and sequences, and which vendors own each interface. The team should also define how it will test performance and what documentation must transfer at handover. The coordination challenge is […]

Equipment Loads Before Construction: What Owners Need Coordinated Before Procurement

Equipment load planning should begin before the owner commits to equipment that depends on building power, cooling, ventilation, plumbing, structure, controls, space, or access. The project team needs current vendor information and qualified technical review early enough to coordinate the infrastructure before purchasing and construction decisions become difficult to change. The owner-side objective is simple: […]

Permit Delays in Commercial Construction: What Owners Can Control Before Submission

Commercial construction permit delays often begin before the application reaches the reviewing authority. Missing information, unresolved scope, incomplete consultant coordination, late owner decisions, and unclear resubmittal responsibility can all weaken the submission path. Owners should manage the parts of permit readiness they can control while recognizing that agency requirements and review timing vary by jurisdiction. […]

CSI UniFormat Explained for Owners: How It Helps Organize Early Construction Cost Decisions

CSI UniFormat gives owners a consistent way to organize early cost information by building systems and assemblies before the design supports detailed trade-level pricing. That structure makes it easier to compare estimate changes across design stages, especially when the team explains what changed within each element. The CSI UniFormat description explains that UniFormat groups a […]

Owner-Furnished Equipment Coordination: How to Prevent Scope and Schedule Gaps

Owner-furnished equipment coordination should define who selects, purchases, receives, stores, installs, connects, starts up, and trains. Accept each item before the owner releases the order. The equipment may sit outside the contractor purchase order while still driving design, infrastructure, schedule, access, and turnover. The solution is not a longer equipment list. Owners need an interface […]

Baseline Construction Schedule Review: What Owners Should Validate Before Work Starts

A baseline construction schedule review should test whether the planned sequence supports owner milestones, procurement decisions, and access constraints. Reporting needs that will govern the project. The review should validate the logic and assumptions behind the dates, not merely confirm that a schedule file exists. The review is not about dictating means and methods that […]

A Commercial Project Is Behind Schedule: How Should an Owner Evaluate the Recovery Plan?

A construction schedule recovery plan is credible only when it identifies the root cause of slippage, highlights the activities controlling the affected milestone, explains corrective actions, and creates measurable checkpoints. Owners should evaluate the recovery plan as a binding execution commitment, not a simple finish-date revision. To maintain full transparency, the team must clearly demonstrate […]